projects

SE Rio Grande - WTORRE

The Substation of 69KV-25MVA, feeds the first large dry dock of Brazil. The structure set up by Benco Energy has two transformers 10/12, 5 MVA power, with room to double their capacity and receive two more sub-units. The dry dock has dimensions of 130 meters, 350 meters long and 18 meters deep. The structure of the Dry Dock can be filled or emptied of water, which is required for the construction of the extraction of oil and gas.



The Company | Business Affairs | QSEH | Projects | Clients | Contacts | Press Room | Publications | Work With Us
Copyright 2018 Benco - All rights reserved.